POW_6568_20121119 - Washington Times
Skip to content

Construction crews start work on the 1,000-yard outer fence that will run along the perimeter of the Washington Monument in Washington on Monday, Nov. 19, 2012. The monument has been closed since Aug. 25, 2011, when a 5.8-magnitude earthquake occurred less than 100 miles southwest of the city. The repairs will occur in conjunction with the Mall Renovation Project that was already scheduled. The scaffolding and construction work will start soon after the fence is in place. (Craig Bisacre/The Washington Times)
Photo by: CRAIG BISACRE
Construction crews start work on the 1,000-yard outer fence that will run along the perimeter of the Washington Monument in Washington on Monday, Nov. 19, 2012. The monument has been closed since Aug. 25, 2011, when a 5.8-magnitude earthquake occurred less than 100 miles southwest of the city. The repairs will occur in conjunction with the Mall Renovation Project that was already scheduled. The scaffolding and construction work will start soon after the fence is in place. (Craig Bisacre/The Washington Times)

Featured Photo Galleries

10302012_4_10302012_4_hires

Bizarre border busts

Photos from the U.S. Customs and Border Protection of the most bizarre attempts at smuggling drugs and people