20110425-171029-pic-160940342.jpg - Washington Times
Skip to content

A worker cleans up a statue inside the Bolshoi Theater. The renovation is bringing back the original 19th-century design, with restored czarist insignia, embroidered silk tapestry and acoustics-improving fir and papier-mache panels. (Associated Press)

A worker cleans up a statue inside the Bolshoi Theater. The renovation is bringing back the original 19th-century design, with restored czarist insignia, embroidered silk tapestry and acoustics-improving fir and papier-mache panels. (Associated Press)

Featured Photo Galleries

CounselGalleryCOVER.jpg

Special Counsels Rack Up Bills

Robert Mueller’s special counsel investigation into Russian meddling in the 2016 election has cost $6.7 million during the first four and a half months of the probe. Click to see past independent counsel investigations guilty of racking up high bills.