78714ee2039b430a4e0f6a7067007312.jpg - Washington Times
Skip to content

FOR RELEASE SATURDAY, MARCH 15 2014 AT 12:01 A.M. CDT - In this March 5, 2014 photo, a helicopter crew from Aerial Solutions, Inc. of North Carolina, hauls a heavy-duty air saw over the town of Cooperstown, Wis. American Transmission Co., which operates a 345,000-volt energy transmission line that runs from the Point Beach Nuclear Plant in northeastern Manitowoc County west across southern Brown County, hired the helicopter to trim trees along the transmission lines. (AP Photo/Herald-Times Reporter, Sue Pischke) NO SALES

FOR RELEASE SATURDAY, MARCH 15 2014 AT 12:01 A.M. CDT - In this March 5, 2014 photo, a helicopter crew from Aerial Solutions, Inc. of North Carolina, hauls a heavy-duty air saw over the town of Cooperstown, Wis. American Transmission Co., which operates a 345,000-volt energy transmission line that runs from the Point Beach Nuclear Plant in northeastern Manitowoc County west across southern Brown County, hired the helicopter to trim trees along the transmission lines. (AP Photo/Herald-Times Reporter, Sue Pischke) NO SALES

Featured Photo Galleries

CounselGalleryCOVER.jpg

Special Counsels Rack Up Bills

Robert Mueller’s special counsel investigation into Russian meddling in the 2016 election has cost $6.7 million during the first four and a half months of the probe. Click to see past independent counsel investigations guilty of racking up high bills.