Unknown-7 - Washington Times
Skip to content

Allen Snook with Simpson Development sets up a water pump on Sept. 9, 2011, to help with water removal in the basement parking lot under the Alexandria Tech Center 4 on Eisenhower Avenue in Alexandria, Va. The lot was flooded after heavy rains pounded the region the previous night. (Andrew Harnik/The Washington Times)
Photo by: ANDREW HARNIK
Allen Snook with Simpson Development sets up a water pump on Sept. 9, 2011, to help with water removal in the basement parking lot under the Alexandria Tech Center 4 on Eisenhower Avenue in Alexandria, Va. The lot was flooded after heavy rains pounded the region the previous night. (Andrew Harnik/The Washington Times)

Featured Photo Galleries

CounselGalleryCOVER.jpg

Special Counsels Rack Up Bills

Robert Mueller’s special counsel investigation into Russian meddling in the 2016 election has cost $6.7 million during the first four and a half months of the probe. Click to see past independent counsel investigations guilty of racking up high bills.