- Associated Press - Friday, November 13, 2015

SAN FRANCISCO (AP) - The largest remaining pier of the old eastern span of the Oakland-San Francisco Bay Bridge is set for demolition early Saturday,

The San Francisco Chronicle reports (https://sfg.ly/1H0olyD ) Friday that the bridge will be shut down for about 30 minutes starting at 6:45 a.m. or 7 a.m. Saturday.

The six-second implosion is scheduled to happen early to take advantage of slack tide, limited wildlife activity and light traffic. It could be pushed back to 1 p.m.

Caltrans says that a wooden and steel mat placed atop the concrete pier will keep debris from flying onto the new span when nearly 20,000 pounds of dynamite are detonated.

Bay Bridge traffic will be stopped for 15 minutes before the implosion. The bicycle and pedestrian paths on the south side of the span will close starting Friday night. BART is expecting delays.

Copyright © 2018 The Washington Times, LLC.

The Washington Times Comment Policy

The Washington Times is switching its third-party commenting system from Disqus to Spot.IM. You will need to either create an account with Spot.im or if you wish to use your Disqus account look under the Conversation for the link "Have a Disqus Account?". Please read our Comment Policy before commenting.

 

Click to Read More

Click to Hide