- Associated Press - Thursday, March 3, 2016

FRENCHTOWN TOWNSHIP, Mich. (AP) - DTE Energy Co. says it’s working to correct an equipment problem at Fermi 2 nuclear power plant in southeastern Michigan.

DTE spokesman Stephen Tait says repairs are being made to part of the plant’s feed water system that was “giving us trouble.” He tells the Monroe News (https://bit.ly/1L6cLUF ) the plant has been operating at reduced power since Saturday and it’s expected to be “back to 100 percent soon.”

Tait says Fermi 2 remains operational during the work. The Detroit-based utility’s plant is located along Lake Erie in Monroe County’s Frenchtown Township.

___

Information from: Monroe News, https://www.monroenews.com

Copyright © 2018 The Washington Times, LLC.

The Washington Times Comment Policy

The Washington Times is switching its third-party commenting system from Disqus to Spot.IM. You will need to either create an account with Spot.im or if you wish to use your Disqus account look under the Conversation for the link "Have a Disqus Account?". Please read our Comment Policy before commenting.

 

Click to Read More

Click to Hide