- Associated Press - Monday, May 9, 2016

ST. IGNACE, Mich. (AP) - Crews are making annual springtime repairs to the Mackinac Bridge as traffic starts to pick up ahead of Michigan’s summer tourism season.

The Mackinac Bridge Authority says steeplejacks, who climb out onto the bridge’s cables and beams, are inspecting the bridge for any winter damage. They’re looking for steel grating that needs reinforcement and deck joints that have been damaged by snowplows.

Spot painting and concrete patching are planned at the bridge. Crews also are sweeping up sand that’s accumulated on the causeway and bridge over the winter. Sand is used instead of road salt at the bridge to help keep the driving surface safe during winter months.

Traffic typically peaks at the roughly 5-mile-long bridge connecting Michigan’s Upper and Lower peninsulas in August.

___

Online:

https://www.mackinacbridge.org

Copyright © 2018 The Washington Times, LLC.

The Washington Times Comment Policy

The Washington Times is switching its third-party commenting system from Disqus to Spot.IM. You will need to either create an account with Spot.im or if you wish to use your Disqus account look under the Conversation for the link "Have a Disqus Account?". Please read our Comment Policy before commenting.

 

Click to Read More

Click to Hide