- Associated Press - Friday, October 14, 2016

PORTSMOUTH, N.H. (AP) - The center span of the closed Sarah Mildred Long Bridge connecting New Hampshire and Maine is going to be removed.

A barge is scheduled to be floated underneath the center span on Friday night. The incoming tide will lift the barge until it connects with the center span and the span is disconnected from the bridge.

The bridge connected Portsmouth, New Hampshire, to Kittery, Maine via the U.S. Route 1 Bypass before it malfunctioned in August. The span has since been locked in its open position and was closed permanently on Aug. 24.

The bridge’s $158 million replacement is expected to open to traffic in September 2017.

Copyright © 2018 The Washington Times, LLC.

The Washington Times Comment Policy

The Washington Times is switching its third-party commenting system from Disqus to Spot.IM. You will need to either create an account with Spot.im or if you wish to use your Disqus account look under the Conversation for the link "Have a Disqus Account?". Please read our Comment Policy before commenting.


Click to Read More and View Comments

Click to Hide